[protected]
Quality & metrology · Aspherics Applications Engineering

First article inspection and lot release

How a molded lens moves from approved drawing to repeat production: what the first article proves, what each lot is checked against and which documents ship with it.

First article
every drawing characteristic
Lots
released against the first-article record
Sampling
agreed per characteristic
Documents
CoC per lot; reports on request
From approved drawing to repeat production: the first article freezes the drawing; every lot is released against it.
From approved drawing to repeat production: the first article freezes the drawing; every lot is released against it.

The first article

The first article is made on the production tool, glass and process and measured against every characteristic on the drawing: transmitted wavefront, surface form, dimensions, centring, surface imperfections and coating. Its report, once approved, freezes the drawing revision, the acceptance criteria and the process route.

Lot release

Production lots are released against the first-article record. The functional characteristics, such as transmitted wavefront, critical dimensions and cosmetic quality, are inspected on samples drawn from each lot. Sampling plans are agreed per characteristic, commonly to ISO 2859-1 at a stated AQL. Each lot is traceable to its tool, glass and coating run.

Documents

  • Certificate of conformance with each lot, against the released drawing.
  • Lot inspection report with measured wavefront and dimensional data, on request.
  • RoHS, REACH SVHC and TSCA statements per part number.
  • Glass data for the molding glass of the lens.

The documents are listed under quality and compliance documents.

Changes after release

A change of tool, glass, coating design or assembly process goes through change notification. Where it can affect form, fit or function, a new first article is run before parts ship under the same part number.

What to agree before the first order

  • Drawing revision and acceptance criteria.
  • Characteristics reported per lot, and in what form.
  • Sampling plan and AQL.
  • Packaging and labelling.
  • Documents required with each delivery.

Inspection methods are described under metrology and production control.

Frequently Asked Questions

Is a first article needed for catalogue parts?

Catalogue parts are already released. A first article for your order is available when you need one on record, for example for a qualification.

Can we receive measured data per lot?

Yes. Wavefront and dimensional reports are available on request; state it with the order.